Re-run a saved report

  1. Click the Projects tab, click the link for a project that uses Project Tracker, and click Project tracker > Generate reports in the navigation pane.
  2. Click the link for the report.
  3. Click one of the sub-tabs (Report Information, Row Content, or Column Content) and edit the information on the tab.
  4. Click Generate Report.