Re-run a saved report
- Click the Projects tab, click the link for a project that uses Project Tracker, and click Project tracker > Generate reports in the navigation pane.
- Click the link for the report.
- Click one of the sub-tabs (Report Information, Row Content, or Column Content) and edit the information on the tab.
- Click Generate Report.